  • Warsaw Spire

    Dane techniczne: Inwestor:    Ghelamco Poland Sp. z o.o. Powierzchnia zabudowy:     5.943,4m2 Powierzchnia całkowita:     10.4300 m2 Powierzchnia użytkowa:    102.624,66m2 Kubatura:    474.698,97m3 Liczba kondygnacji:     5 podziemnych, 17 nadziemnych (budynki B i C), 50 nadziemnych (budynek A – wieża) Ilość wbudowanego betonu:    86.644m3 Ilość wbudowanej stali:    15.000,00 ton Obiekt składa się z trzech budynków („A”, […]

  • IBC Building in Warsaw

    An office building constructed in a complicated geometrical disposition. Time period in which the works were carried out: October 2001 – April 2002 Range of construction works performed: – Monolithic reinforced concrete pillars – 553 pieces – Monolithic reinforced concrete ceiling constructions – 10.000 m2 – Monolithic reinforced concrete hooks – 3.000 mb – Monolithic […]

  • Senator, ul. Bielańska 10 in Warsaw

    Generalny Wykonawca: Ghelamco Poland Sp. z o.o. Budynek biurowo-usługowy, który składa się z części nowej oraz zachowanych zabytkowych fragmentów dawnej zabudowy podanych renowacji. Budynek posiada pięciopiętrową galerię przykrytą stalowym dachem ze szklanym świetlikiem, dwupiętrowe antresole (na 4 i 5 piętrze) oraz trzy poziomy garaży podziemnych. W centralnej części budynku znajduje się patio w kształcie ściętego […]

  • Mokotów Nova ul. Magazynowa / Wołoska in Warsaw

    Generalny Wykonawca: GHELAMCO Poland Sp. z o.o. Kompleks czterech budynków biurowo – usługowych, posadowiony na głębokości 10 m poniżej poziomu terenu, 3 kondygnacje podziemne pod budynkami (garaż) – powierzchnia 1 kondygnacji podziemnej ok. 13.000 m2, jeden budynek biurowo – usługowy o 12 kondygnacjach, jeden o 7 kondygnacjach oraz dwa o 9 kondygnacjach. Powierzchnia użytkowa kompleksu […]

  • Katowice Business Point, ul. Ściegiennego 3 in Katowicach

    A modern office building in the centre of Katowice, set at depth of 10 m below the ground, 3 underground storeys o Total surface 7.300 m2 (the garage), 11 storeys above the ground. Total surface: 17.000 m2. Monolithic and basic reinforced concrete construction of the building. Time period in which the works were carried out: […]

  • Office building PWPW, ul. Sanguszki 1 in Warsaw

    An office building, part of the „Polskiej Wytwórni Papierów Wartościowych”, construction of the elevator shaft as well as architectural concrete pillars. Time period in which the works were carried out: January 2008 – March 2008 Range of construction works performed – carpentry concrete: – Walls, ceiling constructions, beams and monolithic reinforced concrete – Basic ceiling […]

  • Building A of the Rondo 1 Complex, Al. Jana Pawła II in Warsaw

    Building A of the Rondo 1 – 2 underground storeys, 10 storeys above ground Time period in which the works were carried out: 2003 – 2004 Range of construction works performed: – Monolithic reinforced concrete pillars – 220 pieces – Monolithic reinforced concrete ceiling constructions – 17.000 m2 – Monolithic reinforced concrete walls – 900 […]

  • Marynarska Business Park in Warsaw

    An office – commercial four buildings complex, set at depth of 10 m below the ground, 3 underground storeys (the garage) – Total surface of one storey: 13.000 m2, two office commercial buildings with 10 storeys, one with 7 storeys and one with 11 Total surface of the entire complex: 43.000 m2. Time period in […]

  • Bema Plaza in Wrocław

    Office – commercial – residential buildings complex, 2 underground storeys (the garage), two 7 storey office-commercial buildings and one 8 storey apartment building. Time period in which the works were carried out: November 2006 – November 2007 Range of construction works performed – carpentry concrete, armament and installation works: Monolithic reinforced concrete works: – Basic […]

  • Trinity Park II in Warsaw

    Office – commercial buildings complex – set at depth 10 meters below the ground, 3 underground storeys (the garage), one building containing 11 storeys above the ground, one building of 6 storeys above the ground including a restaurant building. Total surface: 24.000 m2. Time period in which the works were carried out: January 2006 – […]