Project description

General contractor: Konsorcjum: ALPINE BAU, PGB.S.A, ALPINE BAU GmbH, HYDROBUDOWA POL

Construction start: 2009 – September

Completion of construction: 2010 – July

Structural height: 113 m

Height to the roof: 70 m

Architectural height: 113 m

Upper storeys: 9

Underground storeys: 2

Total area: 203920 m2

Office space: 15000 m2

Commercial and service area: 25,000 m2

Parking spaces: 1765

 

The National Stadium is a multifunctional sports facility that total cubic capacity (without a roof) amounts to over 1,000,000 m³. The total area of ​​the stadium is 203,920 m². The spread span of the sliding roof is 240 × 270 m. The total length of the bottom promenade is 924 m.

The scope of works included the performance of:

– monolithic reinforced concrete structure (carpentry, reinforcement works) on sector 8, (9 floors)

– monolithic reinforced concrete ramps,

– assembly of prefabricated elements: bolts, beams, columns, stands, filigree type ceiling slabs,

– architectural concrete elements: walls, columns,

– ceilings in the Bubbledeck system (cobiax)

Constructor

Client:ALPINE BAU, PGB.S.A, ALPINE BAU GmbH, HYDROBUDOWA POLSKA S.A., ALPINE Construction Polska Sp. z o.o.